MUNJAL AUTO INDUSTRIES LIMITED  
Testing Facilities & Lab

Munjal Auto has world class facility of Standard Room well equipped with most advance testing & measuring instruments, metallurgical & chemical labs to carry our regular & periodical testing /inspection with 100 % accuracy. 

 

     
 

 

Standard Room

 

  • CMM   3 D CO-Ordinate Measuring  Machine -4 nos (at all plants)
  • Profile Projector
  • Micro Scope
  • Height Masters
  • Others  including  Surface Table ,Height gauge ,Bevel Protector ,Micrometer ( Inside/ outside),Verniers  etc

 

Metallurgical Lab

 

  • Computerized UTM
  • Wickers Hardness Testing
  • Facility of weld penetration Test
  • Weld strength tester
  • Automatic absorption Spectrophotometer.

 

     

 

Chemical Lab

 

  • Cass Test equipment
  • Salt Spray testing
  • Hot bath chamber
  • Heat Resistance Testing
  • Humidity Resistance testing
  • Water Emerson resistance Testing
  • Atomic absorption Spectrophotometer
  • PH Checking

 

Specialized Testing facilities & Endurance Testing

 

We at Munjal Auto carry out online / off line testing regularly & periodically. To meet ultimate demand of customers we have endurance testing facilities with specially developed equipments & SPMs to meet Quality standard, Durability & specifications given by customers. Our testing labs has appropriate testing facility for exhaust system, Wheel Rims, Fuel tanks & other parts & assemblies made in-house.

 

Testing facility for Exhaust systems

 

  • On Line /Offline Testing
  • Muffler leak Test
  • Sound Testing
  • Weld Quality Test for bead, penetration & Strength.
  • Paint Resistance test using  Muffler furnace , Humidity bath , Hatch test, Dry film & Wet film thickness tests

 

Testing Facility for Wheel Rims

 

  • Online Testing
  • Wheel rim run out measuring and low point marking SPM
  • But Weld joint air leak test
  • Offline Testing
  • Corner fatigue tester
  • Radial fatigue tester
  • Flange bend Strength tester (Impact resistance )
  • Weld strength tester
  • Butt weld joint air leak Testing
  • Rim profile Projector

 

Testing Facility for Fuel Tanks

 

  • Online Testing
  • Leakage Test ( after welding & assembly)

 

  • Off line testing (periodically)
  • Pressure & Vacuum Cycle Test
  • Vacuum  Holding test
  • Hydro pressure Test
  • Impulse Cycle Test
  • Venting Tip angle Test
  • Slosh Test  ( Half Full & Full)
  • Vibration Test
  • Overturn Test
  • Salt spray Test With Chamber Size (1400X 800X1000)  
  • Volume Test
  • Millipore  Contamination  Test
  • Nugget Test
  • Seam strength Test.

 

Testing facility for Spoke Wheel Rim

 

  • Run-out test
  • CASS Test
  • Load test
  • Profile test
  • Weld strength test

 

 

Quality
  1. Quality Policy
  2. Certification
  3. Testing Facilities & Lab
  4. Quality Practices

 

 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Corporate office- 301, 3rd Floor, Galleria Tower,DLF Ph IV, Gurgaon- 122 002, Phone: +91 124 4057891/92, Fax: +91 124 4057892, E-mail: mail@munjalauto.com Waghodia plant - 187, GIDC Industrial Estate, Waghodia -391 760, District: Vadodara (Gujarat), Phone: +91 2668 262421-26, Fax-+91 2668 262427, E-mail: mail@munjalauto.com Bawal Plant - Plot No. - 37,Sector 5 Phase II,G.C Bawal- 123 501,District: Rewari (Haryana), Phone: +91 1284 329800, E-mail: mail@munjalauto.com Haridwar Plant - Plot no - 11 Industrial Park II,Village Salempur Mehdood,Distt: Haridwar( Uttrakhand),E-mail: mail@munjalauto.com